The integrated lifting of carrier-based aircraft is critical to aircraft carrier groups, as it can trasport the damaged aircraft that cannot fly to land-based facilities for repair. This study addresses key challenges in the integrated lifting of carrier-based aircraft, including aircraft load-bearing capacity, safety of lifting equipment, lifting functionality and lifting safety. A technical research roadmap is established, including the mechanical connection between the aircraft and lifting equipment, design and verification of the lifting equipment, functional testing of the lifting process and load-bearing capacity verification of the aircraft. A feasible lifting solution is proposed and a specialized lifting equipment is designed. This research resolves the problem of ship-to-shore transfer of carrier-based aircraft.